BJC completed all exterior framing and the installation of Nichiha cement siding for Victory Church in Clinton Township. A key feature of this project was the use of cold formed metal framing (CFMF) that was fully engineered to support the steel roof trusses and roof deck. Eliminating the need for traditional red iron.
These construction methods allowed for a clean exterior structure while maintaining the strength required for the building’s roof system. The finished Nichiha siding provides a durable, modern exterior that complements the overall design of the church.